Colour changes between sites
The same navy SKU arrives in different shades. A new delivery no longer matches the team.

Coordinate scrubs, lab coats and clinical wear across your healthcare group. One approved colour reference, one graded size chart and one sealed sample keep the next clinic aligned with the first. Give every reorder a measurable starting point.
Solve shade drift, fit variation and fragmented ordering before they multiply across your healthcare network.
The same navy SKU arrives in different shades. A new delivery no longer matches the team.
A Medium should keep its chest, hip and length measurements when another clinic reorders.
Local ordering choices put the same role in different colours across your group.
A general certificate is hard to use when the auditor asks which cloth or lot it covers.
A clinic opening needs a planned release date, size mix and transit window.
Build the programme around what each team wears, then hold the colour palette and size grading across every location.

Scrub sets, warm-up jackets and scrub caps.

Lab coats and task-specific clinical layers.

Surgical scrub sets, caps and specified protective gowns.

Clinical scrubs and branded tunic sets.

Reception tunics, polos and coordinated separates.

Utility tunics, housekeeping sets and patient wear.
Connect each role to a garment family, department colour, size range and care routine. Staff transferring between locations keep the same ordering reference.
A shared programme gives procurement one reference while each location receives its own size and quantity allocation.
For groups planning 5 to 50+ locations: consolidate scrub specifications, department colours and site allocations in one buying schedule.
Coordinate nursing, theatre, diagnostics and support while keeping departmental identification clear.
Carry the practice identity into clinical wear, logo placement and repeat-order colour matching.
Choose comfortable cuts and a laundering plan that fits daily care and repeated shifts.
Develop a private-label clinical range with retained patterns, labelling and replenishment references.
Production starts at 50 pieces per SKU. Single finished garments and 72-hour local restock require a different supply model.
Compare the same garment, evidence and delivery scope. A lower unit price is useful only when the complete specification is covered.
| What matters | Washedloom · Factory programme | Trading / sourcing route | Multiple local suppliers |
|---|---|---|---|
| Colour control | Spectrophotometer comparison; set ΔE ≤1.5 against the approved reference, with method and conditions recorded. | Ask who controls the dye-lot reading and releases the cloth. | Separate shade references make group matching harder. |
| Pricing by site | One quotation schedule for the agreed fabric, sizes, trims and order quantities. | Separate sourcing fees from the factory and delivery costs. | Different local price lists can hide the group total. |
| Sampling | Plan 5 business days after the brief and available materials are confirmed; seal one approved reference. | Confirm that the sample uses the intended production cloth. | Multiple suppliers can create multiple fit approvals. |
| Compliance pack | PO-linked mill records, applicable OEKO-TEX scope, agreed AATCC reports and AQL 2.5 results. | Request the link between the supplied report and production lot. | Use one document index to reconcile different vendors. |
| Specification ownership | Keep the approved pattern, colour reference, size grade and trims under your programme number. | Clarify access to the master file before development. | A fragmented file makes future changes harder to control. |
| Adding another clinic | Issue the new location against the approved programme revision and retained sample. | Check whether a new supplier or material requires re-approval. | Local stock may differ from the original range. |
| Production planning | 15–20 days after final sample approval and material readiness; transit scheduled separately. | Include the sourcing interval in the quoted schedule. | Different supplier calendars require central coordination. |
| Document consistency | Use one PO-indexed file format and a site-by-site packing manifest. | Confirm document ownership and response times. | Standardise records before the goods reach each site. |
Agree the measurements, colour method and wash assessment before sampling, so approval releases a clear production specification.
| Acceptance criterion | Agreed pass rule |
|---|---|
| Dimensions & fit | Agree points of measurement before cutting. Planning tolerance: ±0.5 in / 1.3 cm unless the tech pack specifies a different limit. |
| Colour | Set ΔE ≤1.5 against the approved physical standard; record the instrument, colour-difference formula, illuminant and observer. Check the finished sample. |
| After-wash | Use the actual care routine. ISO 6330 at 60°C can be the domestic-wash starting brief; use an industrial procedure when that matches site laundry. Record shrinkage, shade and seam appearance. |
| Role-specific protection | For gowns or other protective garments, specify the barrier class and market requirements separately. Hi-vis or reflective layouts apply only to roles that require them. |
| Batch inspection | ISO 2859-1, General Inspection Level II: no critical defects accepted; Major AQL 2.5 / Minor AQL 4.0. Record lot size, sample size and acceptance numbers. |
| Documentation | Connect material identity, required lab results and 4-point incoming-fabric inspection to the sample and purchase order. |
Keep roles visually distinct while giving every location the same clinical identity.
Nursing & general ward
Outpatient & reception
Theatre & critical care
Dental & support
Emergency & senior roles
Housekeeping & facilities
These are programme palette examples. Match your existing departmental policy with a physical approval standard.
Read the physical swatch and connect the approved reading to the mill recipe and selected cloth.
Use the agreed ΔE ≤1.5 acceptance target before cutting; assess visual appearance under the chosen light conditions.
Give each department the same colour code at every location. Add new sites to the existing map.
Retain shade readings and approved fabric references so later orders use the original standard.
Give procurement and receiving a shared document index, with material, inspection and packing references that follow the order.

Composition, GSM, fabric article and roll or lot reference for the material actually cut.
AATCC 61 colourfastness and AATCC 135 dimensional-change reports where specified, with the selected wash conditions.
Current material-specific certificate and scope for the chosen skin-contact textile.
Lot, sample size, defect categories and disposition recorded against the agreed ISO 2859-1 plan.
Incoming roll defects logged before cutting, with the agreed acceptance limit.
Carton, site, department, SKU, size and quantity reconciled to the purchase order.
A new clinic uses the same approved programme, with its own quantities and receiving labels.
Combine locations, roles, size quantities and department colours in one garment allocation sheet.
Confirm material, measured shade, grading and logo placement. Seal the approved pre-production sample.
Release the approved revision to the line. Check measurements, construction and shade against the same reference.
Allocate garments and carton labels by location. Reconcile the batch pack and packing list to the PO.
Use the retained specification, review material availability and release the next site allocation. Re-sample when the approved specification changes.
Put purchasing effort into one repeatable specification and a clear release process for each location.
The same points of measurement and grade rules keep size labels tied to the approved fit.
For unchanged specifications and available materials; confirm the order release and transit dates separately.
Compare fabric, garment, decoration, testing, packing and freight on the same specification.
Each clinic allocation links to the master programme and the accepted specification revision.
Colour control, batch records and site-ready packing are the practical tests of a multi-location uniform programme.
A navy colour name is not enough for a network order. I need a physical reference, the agreed colour-difference method and a release record for each dye lot. That gives clinic managers a clear standard when two deliveries are compared.
The fit set needs to work across the size range before bulk approval. Keeping the graded chart, logo sample and care trial under one programme number makes the next order easier to assess.
I also need the cost broken down by garment and delivery scope, with quantities packed by clinic. The useful outcome is a reorder that draws from one approved file instead of restarting the buying process.

A clinic opening depends on the right garments reaching the right team. The order needs a role-to-colour map, a size allocation and carton labels that receiving staff can route without rebuilding the packing list.
For our audit review, I would ask for the fabric identity, applicable textile certificate, laundering reports and inspection record together. Each document should connect to the purchase order and the lot it describes.
Planning gets easier when the sample, production release and freight dates are separate. When another location joins the group, it should use the same approved uniform specification and a new site allocation.

Order quantities, approval rules, colour matching and delivery planning before the first site rollout.
Production starts at 50 pieces per SKU. A pre-production sample can start from one garment. State the fabric, colour, size mix and logo method when requesting the quote; sample fees, revision rounds and any first-order credit are shown separately. An archived specification simplifies reordering, while the available cloth and dye-lot minimum determine the next production minimum.
Plan 5 business days for sampling after the complete brief and available materials are confirmed, then 15–20 days for bulk production after final sample approval. The reference freight window is 14–20 days for suitable routes; the actual transport method and destination decide transit. These stages are sequential: a first-order planning window is about 5–7 weeks plus any material sourcing, revisions or customs delay. Unchanged reorders can be planned at 10–14 production days when materials are available.
Approve the graded measurements, material and trims, finished-garment shade and care trial together. Use the agreed tolerance at every measurement point; the planning reference is ±0.5 in / 1.3 cm unless your tech pack sets another limit. Set colour acceptance at ΔE ≤1.5 under the recorded method. Agree wash cycles and appearance limits before testing. Record each approved revision, then retain the signed sample as the bulk reference.
Yes. Assign a master programme number to the approved fabric, colour standard, size chart, logo placement and trims. Each location supplies its own role and size quantities. Pack and label cartons by clinic, department and SKU, then provide one matching allocation list. A new clinic uses the same approved revision; a changed fabric, fit or care requirement triggers a review before release.
Retain the approved physical standard and instrument reading by SKU. Compare the next dye lot before cutting, using the same colour-difference formula, illuminant and observer, with ΔE ≤1.5 as the agreed target. Review finished-garment appearance and the specified wash result as well. Re-approve a replacement fabric or mill rather than silently treating it as the original cloth.
Create one role-to-colour matrix for the group. For example: navy for nursing, ceil blue for outpatient, hunter green for theatre, teal for dental, burgundy for selected senior or emergency roles, and charcoal for support. Your clinical policy sets the final assignments. Put the same code on the garment specification, ordering sheet and carton allocation so every site orders from the same map.
Share your location list, team roles, colour references, size quantities and target delivery date. Get a practical starting brief and quotation response within 24 hours.