Skip to content
Original illustrative clinical team in coordinated navy medical scrubs
Multi-Site Medical Uniform Programs

One clinical standard.
Every department.
Every location.

Coordinate scrubs, lab coats and clinical wear across your healthcare group. One approved colour reference, one graded size chart and one sealed sample keep the next clinic aligned with the first. Give every reorder a measurable starting point.

10Production Lines
15,000 m²Manufacturing Facility
5 DaysSample Planning
50 PiecesMOQ per SKU
Why medical programmes break

More clinics. The same five risks.

Solve shade drift, fit variation and fragmented ordering before they multiply across your healthcare network.

01

Colour changes between sites

The same navy SKU arrives in different shades. A new delivery no longer matches the team.

Procurement impactAn off-shade lot can mean replacement stock.
02

The same size fits differently

A Medium should keep its chest, hip and length measurements when another clinic reorders.

Procurement impactRe-grading adds patterns, exchanges and delay.
03

Department codes stop working

Local ordering choices put the same role in different colours across your group.

Procurement impactRe-labelling cannot correct the wrong garment.
04

Documents do not match the batch

A general certificate is hard to use when the auditor asks which cloth or lot it covers.

Procurement impactMissing traceability slows procurement approval.
05

Opening dates outrun delivery

A clinic opening needs a planned release date, size mix and transit window.

Procurement impactLate stock creates emergency purchasing.
What the programme covers

Every clinical role. One coordinated range.

Build the programme around what each team wears, then hold the colour palette and size grading across every location.

Nursing & Ward — original illustrative uniform scene

Nursing & Ward

Scrub sets, warm-up jackets and scrub caps.

Laboratory & Diagnostics — original illustrative uniform scene

Laboratory & Diagnostics

Lab coats and task-specific clinical layers.

Theatre & Surgical — original illustrative uniform scene

Theatre & Surgical

Surgical scrub sets, caps and specified protective gowns.

Dental & Outpatient — original illustrative uniform scene

Dental & Outpatient

Clinical scrubs and branded tunic sets.

Front-of-House & Admin — original illustrative uniform scene

Front-of-House & Admin

Reception tunics, polos and coordinated separates.

Support & Housekeeping — original illustrative uniform scene

Support & Housekeeping

Utility tunics, housekeeping sets and patient wear.

Connect each role to a garment family, department colour, size range and care routine. Staff transferring between locations keep the same ordering reference.

Who it fits

Built for healthcare groups with more than one site.

A shared programme gives procurement one reference while each location receives its own size and quantity allocation.

Clinic & outpatient networks

For groups planning 5 to 50+ locations: consolidate scrub specifications, department colours and site allocations in one buying schedule.

Hospitals & health systems

Coordinate nursing, theatre, diagnostics and support while keeping departmental identification clear.

Dental & specialist groups

Carry the practice identity into clinical wear, logo placement and repeat-order colour matching.

Senior care & rehabilitation

Choose comfortable cuts and a laundering plan that fits daily care and repeated shifts.

Uniform & linen distributors

Develop a private-label clinical range with retained patterns, labelling and replenishment references.

Order scope

Production starts at 50 pieces per SKU. Single finished garments and 72-hour local restock require a different supply model.

Why factory-direct

One programme owner. Fewer hand-offs.

Compare the same garment, evidence and delivery scope. A lower unit price is useful only when the complete specification is covered.

What mattersWashedloom · Factory programmeTrading / sourcing routeMultiple local suppliers
Colour controlSpectrophotometer comparison; set ΔE ≤1.5 against the approved reference, with method and conditions recorded.Ask who controls the dye-lot reading and releases the cloth.Separate shade references make group matching harder.
Pricing by siteOne quotation schedule for the agreed fabric, sizes, trims and order quantities.Separate sourcing fees from the factory and delivery costs.Different local price lists can hide the group total.
SamplingPlan 5 business days after the brief and available materials are confirmed; seal one approved reference.Confirm that the sample uses the intended production cloth.Multiple suppliers can create multiple fit approvals.
Compliance packPO-linked mill records, applicable OEKO-TEX scope, agreed AATCC reports and AQL 2.5 results.Request the link between the supplied report and production lot.Use one document index to reconcile different vendors.
Specification ownershipKeep the approved pattern, colour reference, size grade and trims under your programme number.Clarify access to the master file before development.A fragmented file makes future changes harder to control.
Adding another clinicIssue the new location against the approved programme revision and retained sample.Check whether a new supplier or material requires re-approval.Local stock may differ from the original range.
Production planning15–20 days after final sample approval and material readiness; transit scheduled separately.Include the sourcing interval in the quoted schedule.Different supplier calendars require central coordination.
Document consistencyUse one PO-indexed file format and a site-by-site packing manifest.Confirm document ownership and response times.Standardise records before the goods reach each site.
Sampling

Approve the sample. Know the pass rules.

Agree the measurements, colour method and wash assessment before sampling, so approval releases a clear production specification.

Acceptance criterionAgreed pass rule
Dimensions & fitAgree points of measurement before cutting. Planning tolerance: ±0.5 in / 1.3 cm unless the tech pack specifies a different limit.
ColourSet ΔE ≤1.5 against the approved physical standard; record the instrument, colour-difference formula, illuminant and observer. Check the finished sample.
After-washUse the actual care routine. ISO 6330 at 60°C can be the domestic-wash starting brief; use an industrial procedure when that matches site laundry. Record shrinkage, shade and seam appearance.
Role-specific protectionFor gowns or other protective garments, specify the barrier class and market requirements separately. Hi-vis or reflective layouts apply only to roles that require them.
Batch inspectionISO 2859-1, General Inspection Level II: no critical defects accepted; Major AQL 2.5 / Minor AQL 4.0. Record lot size, sample size and acceptance numbers.
DocumentationConnect material identity, required lab results and 4-point incoming-fabric inspection to the sample and purchase order.
One palette, every site

One department colour. Across the whole group.

Keep roles visually distinct while giving every location the same clinical identity.

Department colour map

Navy Blue

Nursing & general ward

Ceil Blue

Outpatient & reception

Hunter Green

Theatre & critical care

Teal

Dental & support

Burgundy

Emergency & senior roles

Charcoal

Housekeeping & facilities

These are programme palette examples. Match your existing departmental policy with a physical approval standard.

Four controls for repeatable colour

1

Approve one master shade

Read the physical swatch and connect the approved reading to the mill recipe and selected cloth.

2

Check every incoming dye lot

Use the agreed ΔE ≤1.5 acceptance target before cutting; assess visual appearance under the chosen light conditions.

3

Keep one role-to-colour map

Give each department the same colour code at every location. Add new sites to the existing map.

4

Archive the reference by SKU

Retain shade readings and approved fabric references so later orders use the original standard.

Audit-ready, filed by PO

The right documents. Linked to the right batch.

Give procurement and receiving a shared document index, with material, inspection and packing references that follow the order.

Supplied real factory photograph: garment finishing and inspection beside folded garment stacks

Fabric mill record

Composition, GSM, fabric article and roll or lot reference for the material actually cut.

Laundering reports

AATCC 61 colourfastness and AATCC 135 dimensional-change reports where specified, with the selected wash conditions.

OEKO-TEX STANDARD 100

Current material-specific certificate and scope for the chosen skin-contact textile.

AQL 2.5 inspection

Lot, sample size, defect categories and disposition recorded against the agreed ISO 2859-1 plan.

4-point fabric inspection

Incoming roll defects logged before cutting, with the agreed acceptance limit.

Per-location packing list

Carton, site, department, SKU, size and quantity reconciled to the purchase order.

Management & material framework
OEKO-TEX STANDARD 100ISO 9001ISO 14001ISO 45001SMETAamfori BSCI

Material certificates follow the selected textile. Management systems and social audits follow the facility and their applicable scope.

How the programme rolls out

Five stages. One shared record.

A new clinic uses the same approved programme, with its own quantities and receiving labels.

01

Site & role intake

Combine locations, roles, size quantities and department colours in one garment allocation sheet.

02

Sample & specification approval

Confirm material, measured shade, grading and logo placement. Seal the approved pre-production sample.

03

Bulk production & inspection

Release the approved revision to the line. Check measurements, construction and shade against the same reference.

04

Packing & document release

Allocate garments and carton labels by location. Reconcile the batch pack and packing list to the PO.

05

Reorder by programme number

Use the retained specification, review material availability and release the next site allocation. Re-sample when the approved specification changes.

What it changes

Consistent uniforms. Simpler group purchasing.

Put purchasing effort into one repeatable specification and a clear release process for each location.

One grade

Consistent fit across sites

The same points of measurement and grade rules keep size labels tied to the approved fit.

10–14 days

Repeat-production planning

For unchanged specifications and available materials; confirm the order release and transit dates separately.

One cost sheet

A transparent group quotation

Compare fabric, garment, decoration, testing, packing and freight on the same specification.

1 PO reference

Simpler site replenishment

Each clinic allocation links to the master programme and the accepted specification revision.

Procurement perspectives

What healthcare buying teams need.

Colour control, batch records and site-ready packing are the practical tests of a multi-location uniform programme.

A navy colour name is not enough for a network order. I need a physical reference, the agreed colour-difference method and a release record for each dye lot. That gives clinic managers a clear standard when two deliveries are compared.

The fit set needs to work across the size range before bulk approval. Keeping the graded chart, logo sample and care trial under one programme number makes the next order easier to assess.

I also need the cost broken down by garment and delivery scope, with quantities packed by clinic. The useful outcome is a reorder that draws from one approved file instead of restarting the buying process.

Generated portrait for an illustrative Director of Procurement perspective

Director of Procurement

Multi-site Healthcare Group

A clinic opening depends on the right garments reaching the right team. The order needs a role-to-colour map, a size allocation and carton labels that receiving staff can route without rebuilding the packing list.

For our audit review, I would ask for the fabric identity, applicable textile certificate, laundering reports and inspection record together. Each document should connect to the purchase order and the lot it describes.

Planning gets easier when the sample, production release and freight dates are separate. When another location joins the group, it should use the same approved uniform specification and a new site allocation.

Generated portrait for an illustrative Clinical Operations Manager perspective

Clinical Operations Manager

Regional Outpatient Network
FAQ

Medical programme questions. Clear answers.

Order quantities, approval rules, colour matching and delivery planning before the first site rollout.

What is the minimum order, and can we sample first?

Production starts at 50 pieces per SKU. A pre-production sample can start from one garment. State the fabric, colour, size mix and logo method when requesting the quote; sample fees, revision rounds and any first-order credit are shown separately. An archived specification simplifies reordering, while the available cloth and dye-lot minimum determine the next production minimum.

How long do sampling, production and shipping take?

Plan 5 business days for sampling after the complete brief and available materials are confirmed, then 15–20 days for bulk production after final sample approval. The reference freight window is 14–20 days for suitable routes; the actual transport method and destination decide transit. These stages are sequential: a first-order planning window is about 5–7 weeks plus any material sourcing, revisions or customs delay. Unchanged reorders can be planned at 10–14 production days when materials are available.

Exactly what must pass before the sample is approved?

Approve the graded measurements, material and trims, finished-garment shade and care trial together. Use the agreed tolerance at every measurement point; the planning reference is ±0.5 in / 1.3 cm unless your tech pack sets another limit. Set colour acceptance at ΔE ≤1.5 under the recorded method. Agree wash cycles and appearance limits before testing. Record each approved revision, then retain the signed sample as the bulk reference.

Can different clinics order from the same programme?

Yes. Assign a master programme number to the approved fabric, colour standard, size chart, logo placement and trims. Each location supplies its own role and size quantities. Pack and label cartons by clinic, department and SKU, then provide one matching allocation list. A new clinic uses the same approved revision; a changed fabric, fit or care requirement triggers a review before release.

How do you keep the navy consistent on a later reorder?

Retain the approved physical standard and instrument reading by SKU. Compare the next dye lot before cutting, using the same colour-difference formula, illuminant and observer, with ΔE ≤1.5 as the agreed target. Review finished-garment appearance and the specified wash result as well. Re-approve a replacement fabric or mill rather than silently treating it as the original cloth.

How do you organise department colours across all sites?

Create one role-to-colour matrix for the group. For example: navy for nursing, ceil blue for outpatient, hunter green for theatre, teal for dental, burgundy for selected senior or emergency roles, and charcoal for support. Your clinical policy sets the final assignments. Put the same code on the garment specification, ordering sheet and carton allocation so every site orders from the same map.

Start your programme

Send your sites. We’ll organise the specification.

Share your location list, team roles, colour references, size quantities and target delivery date. Get a practical starting brief and quotation response within 24 hours.

Discuss a rollout with our team

Get a Quote

Search Washedloom

Chat on WhatsApp