
Front Desk & Concierge
The first impression a guest receives. Crisp drape, a wrinkle-resistant finish, and a colour that survives the commercial laundry your property already runs.
WearsBlazers, dress shirts, waistcoats, neckwear
One look, every property. Coordinate front desk, food service, kitchen, housekeeping and banquet uniforms through one approved palette and graded size chart. Keep fabric, branding and packing references together so each new property starts from the same specification.
A multi-property program breaks at the seams between properties: colour drifts hotel to hotel, kitchen wear dies in the laundry, sizing falls apart across high-turnover teams, and paperwork scatters. One factory, one locked colour spec, and one file per PO closes those seams.
The new hotel opens a shade off the first. Guests feel it before procurement can measure it, and the brand standard slips.
What it costsOne off-shade run is a full re-cut — a new approval and production run at each affected property.
Coats grey out, collars curl, buttons crack in the steam tunnel by week six. Kitchens run the heaviest cycle on the property.
What it costsA brigade re-supply mid-season is a full re-order, not a patch.
A “Medium” that fits the sample and not the reorder. New starters cycle through constantly and fit complaints pile up at every outlet.
What it costsA fit re-grade means new patterns before any property is re-supplied.
Front of house, kitchen, and housekeeping buy separately — no shared identity and no group view of spend.
What it costsNo shared record means the same spec is re-negotiated at every property.
A procurement audit lands unannounced and the wash-test reports trace to nothing.
What it costsOne certificate that traces to nothing puts the listing it covers at risk.
Connect cutting, sewing, embroidery and packing to one approved production brief. Review dye-lot readings before cutting and approve substitutions before release.
Set a 50-cycle laundry approval plan before bulk cutting. Use ISO 15797 for the agreed industrial process or ISO 6330 for domestic washing; record drying, finishing and pass limits.
Your approved sample is the standard, and Pantone readings are archived per SKU. A property added later still matches.
A hospitality program is a role map, not a catalogue order: five departments — front desk, F&B, kitchen, housekeeping, banquet — each take the garment their work demands, cut from one palette and one size chart.

The first impression a guest receives. Crisp drape, a wrinkle-resistant finish, and a colour that survives the commercial laundry your property already runs.
WearsBlazers, dress shirts, waistcoats, neckwear

Subtle texture hides the creases of a double shift, and a breathable blend keeps the floor looking sharp at hour eight — not just at first cover.
WearsServer shirts, blouses, aprons, waistcoats

Double-breasted construction lets a chef reverse a stained panel mid-service, in stain-release fabric that lifts tomato, oil, and wine in the steam tunnel.
WearsChef jackets, kitchen trousers, aprons, caps

Built for eight hours of bending, reaching, and kneeling — reinforced stress points, a twill that hides the day, and moisture-wicking comfort between turns.
WearsTunics, trousers, tabards

Formal service wear that packs and travels flat for events off-site, and still reads crisply across a banquet floor after a hundred covers.
WearsBanquet shirts, vests, ties, service aprons
Every family — blazers, shirts, tunics, chef jackets, aprons — is cut to the same palette and the same graded size chart.
Compare colour control, pricing, sampling and repeat-order records on the same specification and delivery basis.
| What matters | Washedloom (factory-direct) | Trading company | Local multi-suppliers |
|---|---|---|---|
| Colour control | ΔE ≤1.5 target with the approved reference and measurement method retained per SKU. | Confirm who reads and approves each dye lot. | Agree one physical reference across local vendors. |
| Per-property pricing | One cost schedule for the group: garment, branding, testing, packing and freight separated. | Identify sourcing fees and the full delivery scope. | Compare equivalent fabric, branding and packing across cities. |
| Sampling | Sample planning: 5 business days after complete brief and available materials. | Confirm stock versus developed samples and revision time. | Approve each vendor’s fit and construction. |
| Compliance file | PO-linked material records, agreed tests, inspection and property packing lists. | Confirm who verifies material scope and test validity. | Reconcile the different report formats and material identities. |
| Spec ownership | Fabric, size grade, artwork and approved revisions retained under your programme. | Agree access to the approved technical files. | Maintain a shared group specification and revision register. |
| Opening a new property | Use the retained sample and current revision; submit the new site’s size quantities. | Check whether the factory or materials change between orders. | Check stock, colour and size availability for each location. |
| Lead time | Bulk planning: 15–20 days after approval and material readiness; transit separate. | Include supplier sourcing and sample approval in the timeline. | Confirm local stock and production separately for each city. |
| Documentation | One document index and consistent packing format across property orders. | Agree responsibility for a complete PO file. | Require matching location codes and carton lists. |
Not every program needs a single supplier — but for a group that must read as one brand across properties, consolidating the run is what stops the drift.
A sample is a decision, not a gesture. These are the success criteria we agree before cutting — so neither side is negotiating the standard after the sample lands. Copy this into your approval doc.
| Criterion | Pass rule |
|---|---|
| Dimensions & fit | Agree points of measurement and size grading before cutting. Planning tolerance: ±0.5 in / 1.3 cm unless the tech pack specifies another limit. |
| Colour | Target ΔE ≤1.5 against the approved physical reference. Record the instrument, formula, illuminant and observer; compare the finished garment after the agreed care process. |
| After-wash | Agree a 50-cycle approval plan with checkpoints for colour, shrinkage, seams, buttons and embroidery. Specify ISO 15797 industrial or ISO 6330 domestic conditions to match the actual laundry route. |
| Branding & construction | Approve logo size, thread colour, placement, backing and stitch density. Check collar shape, closures, apron ties and pocket reinforcement after laundering. |
| Batch inspection | ISO 2859-1 General Inspection Level II; no critical defects accepted, Major AQL 2.5 / Minor AQL 4.0. Record lot size, sample size and acceptance numbers. |
| Documentation | Retain fabric/lot identity, agreed test results, incoming inspection and the purchase-order packing list. Any certificate must cover the supplied material and valid scope. |
A sample lands approved in one round when these arrive with the brief. Hand them over late and the first sample is guessing — this is the checklist that stops that.
Wash conditions
How the garment is laundered on site — commercial or industrial, wash temperature, detergent, and dryer or iron finish. Agree the test route and conditions before sampling.
Role list
Every role on site, the colour and standard each one needs, and headcount per role per location — the map the whole program is built against.
Size distribution
The size breakdown to order, and human measurements where the program is made-to-measure rather than graded from a chart.
Reference colour
A Pantone number, physical swatch, or existing garment we can read by spectrophotometer, so the colour formula is locked to your reference, not matched by eye.
Standards by market
Destination market, required material certificates, care labelling and any buyer-specific laundry or restricted-substance requirements.
First delivery window
The date the first site needs stock, so sampling and production are scheduled against a real deadline instead of a placeholder.
Agree one document index per purchase order: material identity, applicable test records, inspection results and per-property packing lists. Each record must identify the material or lot it covers.
Fibre composition, blend, and weight for the roll the batch was cut from.
Colourfastness (AATCC 61) and shrinkage (AATCC 135) on the finished garment, tested to your property’s wash cycle.
For a specified OEKO-TEX material, retain the certificate number, validity and scope covering the selected textile.
Record the selected wash procedure, cycle count and results for colour, dimensions and hardware. The 50-cycle plan is agreed before sample approval.
ISO 2859-1 sampling results from the pre-shipment audit, per lot.
Cartons labelled and packed by property, so your team unloads straight to the floor.
Repeat orders use the current approved revision. Check material or care-process changes and update the supporting file before production.
Five stages from intake to reorder, all against one locked spec. Plan sample approval, production and freight as separate stages. New materials, special tests or changes to the design need additional approval before scheduling.
Send your properties, departments, brand colour map, and quantities — or just a brief. A named engineer builds the role-to-garment list and replies with a spec within 24 hours.
Brand colours are read at the dye house, the size grade is set, and a pre-production sample is cut on the production line and couriered for approval. Approve it and it is sealed as the golden standard.
Bulk production runs from sample approval, with the agreed in-process checks and pre-shipment AQL sampling. Colour and sizing are measured against the sealed sample — not eyeballed per property.
Each shipment is packed and labelled per property with its own packing list, and the batch compliance pack ships filed by PO. Distribution unloads straight to the floor.
Any property reorders on a one-line PO against the archived spec. A property added later still matches your first rollout.
* Repeat-production planning of 10–14 days applies to unchanged styles with available materials. Confirm release and freight separately. Sample charges and any production credit are itemised in the quotation. Review changed fabric or laundry conditions before repeating the run.
Built for groups running five to fifty-plus properties on one coordinated look, and a poor fit for a single property that needs 72-hour local restock or one-off garments under the 50-unit per SKU minimum.
5 to 50+ properties on one coordinated look, one colour map, and one supplier instead of a vendor per hotel.
Multi-outlet brands where front of house, bar, and kitchen stay visually distinct yet part of one identity.
Brand-conscious hotels and clubs matching wear to a logo palette, the same at every location.
Catering and event operators balancing presentation, wash durability, and a reliable colour code.
Resellers who need a factory to run a private-label hospitality line to a locked spec.
Across several hotels, I need the front desk, housekeeping and kitchen to look like one brand. The buying file should connect each department to its garments, approved colour and size chart.
My colour approval starts with a physical reference and an agreed ΔE ≤1.5 method. Keep the reading and approved sample under the SKU, then check each new dye lot before cutting.
For a new property, reuse that specification and submit the location’s size quantities and opening date. Pack by property and department so the receiving team can issue the right kit.
Group Brand Standards Manager
Hotels & Resorts · Uniform Programme
For kitchen uniforms, the laundry process belongs in the first brief: temperature, detergent, drying and finishing. I need a 50-cycle approval plan with colour, dimensional change, seams and hardware checked at the agreed stages.
The quote must show fabric, embroidery, testing, packing and freight separately. A sample is planned in 5 business days once the brief and materials are ready; bulk production follows approval in 15–20 days.
Retain the material lot, inspection report and packing list under the purchase order. That gives every restaurant a clear reference when it receives stock or places a repeat order.
Group Procurement Manager
Restaurants & Contract Catering
If your question isn’t here, our RFQ desk responds within 24 hours — no sales pitch, just specs.
Yes. Archive fabric, colour reference, size grade, branding and approved sample under one programme number. Each property sends role and size quantities against that revision. Cartons are labelled by property and department with a matching packing list. Changes to fabric, wash process or fit require approval before the next run.
Approve a physical swatch or reference garment first. Agree ΔE ≤1.5 with the measurement method, instrument and viewing conditions recorded. Check each dye lot against that reference before cutting and retain the finished-garment sample for repeat orders.
Send the laundry temperature, detergent, drying and finishing process. We build a 50-cycle approval plan around ISO 15797 for industrial care or ISO 6330 for domestic washing. Agree pass limits for colour, shrinkage, seams, buttons and embroidery before bulk production; the completed report records the actual result.
Use one role-to-colour map across front desk, F&B, kitchen, housekeeping and banquet. Assign each role a garment family, colour reference, logo placement and size grade. New outlets order against that map; pack and label their quantities separately.
A group programme gives every property the same retained specification, sample and document index. Compare the garment, decoration, testing, packing and freight on the same basis. Local sourcing can serve urgent local stock needs; the production programme supports planned multi-property orders.
Production starts at 50 pieces per SKU. Sampling is planned at 5 business days after the complete brief and available materials are confirmed; bulk production is planned at 15–20 days after sample approval and material readiness. Freight is quoted separately. For urgent 72-hour restock, check available local stock rather than using a new production schedule.
Send your properties, departments, brand colour map, and quantities — or just a brief. A named engineer builds the role-to-garment list and returns a spec with a quote.
Build your complete issue plan with hospitality uniforms and site-labelled packaging.